BNSF Crookston Iron & Metals Remediation

Meyer Contracting worked with BNSF Environmental Remediation to clean up a former scrap yard located at MP 82X (line segment 32) on the Grand Forks sub. The cleanup involved excavation of impacted soils as well as stabilization of the riverbank immediately upstream (east) of the BNSF bridge.

Soil Remediation: Crews treated and removed approximately 1100 CY of soil from ground surface to 6 ft below ground surface along with approx. 200 CY of battery casing debris from the soil. The impacted soil was treated with EnviroBlend CS Solution, tested, and hauled to the approved landfill. All crew members were HAZWOPER trained.

Riverbank Stabilization: Flotation silt curtain was placed in preparation of slope stabilization activities and a GPS excavator was utilized to place fabric under water and install riprap.

Final completion of the project required backfill, compaction, grading. and restoration of the disturbed areas.

Major Project Items Include:

  • Mass Excavation
  • 1100 CY Soil Removal
  • 200 CY Debris Removal
  • 13000 CY Soil Treatment and Disposal
  • 150 LF 18” Reinforced Concrete Pipe Storm Sewer Excavation & Removal

Location
Crookston, MN

Client
BNSF Railway

Prime Contractor
Meyer Contracting

Services
Earthwork | Rail Services | Soil Remediation | Bank Stabilization