This project for construction of Timbercrest Pond consisted of the reworking of a sediment pond and adding a filtering sediment basin to the existing pond including underground utility installation and earthwork.
The required sitework consisted of 36” RCP and 12” PVC Pipe installation. Our work also included 5,000 SY of finish grade and seeding and site restoration.
Location
Lakeville, MN
Client
Lakeville Timbercrest OVA, LLC
Engineer
Westwood Professional Services, Inc.
Prime Contractor
Meyer Contracting
Services
Utilities | Earthwork
Major Project Items:
- 765 LF of 6” SDR 35 Draintile
- 5,000 SY Site Restoration