CSAH 12 Road Raise

Meyer Contracting was called in on this urgent project for Washington County to raise Highway 12 in Grant, Minnesota. This emergency grade raise was necessary due to overwhelming water levels on both sides of the road from significant rainfall contributing to flooding in the area. To complete the road raise, Meyer teams removed guardrail, barricades, and pavement before installing erosion control measures and excavating. We then completed installation of pipe culverts, rip rap, grading, new pavement, and signage.

The project was completed earlier than scheduled, exceeding expectations for our client and allowing for safe travel on the highway sooner than anticipated.

Major Project Items Include:

  • 2,600 CU YD Class 6
  • 1,000 CU YD Rip Rap
  • 240 LIN FT Pipe Culvert

Location
Grant, MN

Client
Washington County

Prime Contractor
Meyer Contracting

Services
Earthwork | Concrete Structures