CSAH 18 Intersection Improvements

This project for Washington County consisted of new storm drainage, road surfacing and intersection modifications including a new traffic light system. Meyer was required to set up a lane shift and traffic control before completing installation of storm sewer and grading followed by curb and gutter and paving. Pedestrian ramps were installed in addition to concrete and asphalt walkways.

Major Project Items Include:

  • Bituminous and Concrete Removals
  • 1000+ CU YD Excavation
  • Drainage Structures
  • 350 Lin Ft 4” Perf. TP Pipe Drain
  • 88 Lin Ft 15” RC Sewer Pipe

 

Location
Newport, MN

Client
Washington County

Prime Contractor
Meyer Contracting

Services

Concrete Structures | Earthwork | Utilities