41st Ave Water Main Extension

This project consisted of installation of a new water main and roadway replacement. Meyer Contracting was required to remove the existing pavement and water main, including sewer pipe, cub and gutter, and manhole.

We replaced the existing water main with a new system and connected it back up with the remaining system. The final stage of the project consisted of grading and re-paving the street. Upon completion of the project, this neighborhood was up and running once again with a new water main system and newly-paved street!

Major Project Items Include:

  • 1,135 SY Excavation
  • 1,275 SY Bituminous Pavement
  • 165 LF Storm Sewer
  • 220 LF 24” Steel Casing Pipe
  • 600 LF Water Main
  • 225 LF Concrete Curb and Gutter

Location
Robbinsdale, MN

Client
City of Robbinsdale

Prime Contractor
Meyer Contracting

Services
Utilities | Earthwork