U of M - 21st Avenue Project

Meyer Contracting recently completed a very unique project at the University of Minnesota on the Minneapolis Campus.

This project consisted of the removal of the existing Historic brick roadway, removal of the concrete entrance structures and curbing, removal and replacement of the roadway substructure, re-installation of concrete structures and the replacement of the Historic brick roadway.


Minneapolis, MN


University of Minnesota


Demolition | Earthwork | Concrete Structures

Engineer Info


Prime Contractor

Meyer Contracting

Major project items included:

Removal of Historic Brick Roadway
Removal of concrete structures and curbing along roadway
Removal of existing failed base material
Replace roadway base material and compact
Replace curbing and concrete structures at entrance/exit of 21st Avenue
Re-installation of Historic Brick Roadway