TMBC Water Supply Improvements Rolette, ND

The TMBC Well Field Expansion Project was to increase TMBC Water System capacity to a total of 2400 gpm in the Rolette Well Field.

Work consisted of:

  • Constructing and developing 7 additional wells in the shallower portion of the well field for an increase of 800 gpm.
  • Upgrades to the piping and appurtenances within the nearby meter house.
  • Installation of water main from the wells to the meter house
  • Fencing and site work at the well pads.

Location(s)

Belcourt, ND

Client(s)

Turtle Mountain Band of Chippewa

Service(s)

Earthwork | Utilities | Concrete Structures

Engineer Info

Houston Engineering Inc.

Prime Contractor

Meyer Contracting

Major project items included:

Construction of 7 additional wells for an overall increase in pressure to 800 GPM

Upgrade piping and install new water main