Lower St. Anthony Falls Water Main Repair Minneapolis, MN

Meyer Contracting repaired the water main pipeline at the Lower St. Anthony Falls Lock and Dam.

Replacing the damaged portion of the water main with new pipe and installing a cure-in-place pipe (CIPP) liner within the existing water main, pressure testing and disinfection.

Project scope consisted of:

Excavation, soil sampling, pipe cutting, video pipe inspection/reporting, pipe repair, granular backfill, cured-in-place pipe and site preparation and restoration.

Location(s)

St. Paul, MN

Client(s)

USACE

Service(s)

Excavation | Utilities | Concrete Structures

Engineer Info

USACE, St. Paul Division

Prime Contractor

Meyer Contracting

Major project items included:

Repaired the watermain pipeline at the Lower St. Anthony Falls Lock and Dam